HVAC Review and Improvement, New Devices

General Contractor has bought home for his own use as well as office space in basement.

Existing LPG gas heat furnace

Looking for HVAC technician to assess existing system
Sketch existing registers and grilles and ductwork as well as is known.

Make a schedule of grille and register sizes and locations, intent is to replace all devices with quality devices with volume dampers that work.

Also, 2 bedrooms on the East side appear to have no return air ductwork, determine a way to route return air to the furnace.

Would like to jump on this ASAP as drywall work is being finished as we speak, so if drywall needs to come down in the garage ceiling for duct access, this is the time to do it.









4 comments:

  1. Make a center supply trunk run along side of the center beam and use this by swapping the returns with the supply runs on BR2,3 and MBR. This does not "fly" with traditional standards but it's do-able and it actually works very well for cold (AC) supply. As for your East -side apt., consider using a vented door for the furnace room(if enclosed) and vent connected rooms through shared walls so to allow for air movement. Vent BR doors on lower half. Use fully vented door on furnace room. Just suggestions!

    ReplyDelete
    Replies
    1. Thanks Harrydog, will try to wrap my brain around that one.

      Delete
  2. Good morning my name is Pete,I have been in the HVAC trade for 22 years and spent 12 of them in residential new construction. If you would like to speak with me My #414-349-3050. Don't want to just start throwing ideas out there with out knowing exactly what your looking for. Feel free to call, and have a great day.

    ReplyDelete
    Replies
    1. Pete, thanks for responding, I as focusing on paint and floor, and in a few weeks will return to HVAC considerations, and will contact you at that time.

      steveo

      Delete